PROJECT HIGHLIGHTS:
We completely remodeled this Columbus, Ohio (Clintonville) Bathroom.
This included:
1) complete tear out
2) new tub, tile walls around tub, shower fixtures
3) tiled floor
4) custom vanity and recessed medicine cabinet
5) new lighting over vanity
6) adding an exhaust fan to bathroom
7) Toto Toilet
8) White Wainscoting (Bead board)
9) Marble sink top and splashes
10) sink fixtures
11) install a glass block window to replace the existing window
12) painting bathroom
TILE (The Tile Shop):
Shower walls: 10 mm x 40 mm
Bathroom Floor: Hampton Carrera tile